MIL-PRF-19E
TABLE VII. Qualification inspection.
Examination
Requirements
Method
Number of
or test
paragraph
paragraph
defectives 1/
Group I
Visual and mechanical
examination 2/
3.25 to 3.26 inclusive
0
Dielectric withstanding voltage
DC resistance
Torque
Group II
Low temperature storage
Low temperature operation
Thermal shock
Group III
Load life
Salt spray (corrosion)
Group IV
2 4/
Moisture resistance
Group V
Resistance to soldering heat
Rotational life
Switch life 3/
Insulation resistance
Group VI
Shock (specified pulse)
Vibration, high frequency
Group VII
0
Fungus
1/ Failure of an individual resistor in one or more tests of a test group shall be charged
as a single defective.
2/ Marking shall be considered defective only if it is illegible after completion of any of
the required inspections.
3/ Not applicable to locking bushing type resistors.
4/ Number of failures allowed in group III, IV, V, and VI is one, with a combined total of
two overall.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business