MIL-PRF-19E
TABLE IX. Group A inspection.
Method
Examination or test
Requirements paragraph
Sampling plan
paragraph
Subgroup 1
Dielectric withstanding voltage
(atmospheric pressure)
Total resistance
Subgroup 2
Visual and mechanical examination
3.26 inclusive
TABLE X. Group A sampling plan.
Subgroup 1
Subgroup 2
Lot size
sampling plan
sampling plan
1
to
12
100 percent
100 percent
13
to
90
100 percent
13
91
to
150
91
13
151
to
280
151
20
281
to
500
192
29
501
to
1,200
192
34
1,201
to
3,200
192
42
3,201
to
10,000
192
50
10,001
to
35,000
294
60
35,001
to 150,000
294
74
150,001
to 500,000
345
90
500,000
and over
435
102
4.6.3 Group B inspection. Group B inspection shall consist of the tests specified in table XI, in the order shown,
and the sample shall be selected from inspection lots that have passed group A.
4.6.3.1 Sampling plan. A sample of parts shall be randomly selected in accordance with table XII. If one or more
defects are found, the lot shall be screened and defectives removed. After screening and removal of defectives a
new sample of parts shall be randomly selected in accordance with table XII. If one or more defects are found in this
second sample, the lot shall be rejected and shall not be supplied to this specification.
TABLE XI. Group B inspection.
Requirements
Method
Examination or test
paragraph
paragraph
Dielectric withstanding voltage
(reduced barometric pressure)
Total resistance
Torque
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business