MIL-PRF-914C
4.8.16 Moisture resistance (see 3.21). Networks shall be tested in accordance with method 106 of MIL-STD-202.
The following details and exceptions shall apply:
Mounting: Method B (see 4.8.1).
a.
b.
Initial measurement: Immediately following the initial conditioning period, dc resistance of resistors in the
network shall be measured as specified in 4.8.5.
c.
Loading voltage: A dc voltage equivalent to 0.100 of rated wattage not to exceed the maximum rated
voltage (see 3.1) shall be applied to all resistor elements during the first 2 hours of step 1 and step 4.
d.
Subcycle: Step 7b shall not be applicable. Step 7a shall be performed during any five of the first eight
cycles only.
e.
Measurements at high humidity: None.
f.
Final measurements: Upon completion of step 6 of the final cycle, the resistor networks shall be removed
from the chamber and within 8 hours, the dc resistance, dielectric withstanding voltage, and insulation
withstanding voltage and insulation resistance may be performed without the bottom metal plate of figure 4
and figure 5. When the networks are tested as specified, the change in resistance between initial and final
measurements shall not exceed the value specified in 3.21.
g.
Inspection after test: Networks shall be inspected for evidence of mechanical damage.
4.8.17 Shock (specified pulse) (see 3.22). Networks shall be tested in accordance with method 213 of
MIL-STD-202. The following details and exceptions shall apply:
a.
Special mounting means: Leaded components shall be mounted by rigidly restraining the leads; leadless
chip carrier packages shall be mounted by (soldering, clamping, etc.) restraining the body.
b.
Test leads: Test leads used during this test shall be no larger than AWG size 22 stranded wire, so that the
influence of the test lead on the resistor shall be held to a minimum. The test lead length shall be no longer
than necessary.
c.
Measurements before shock: Resistance shall be measured as specified in 4.8.5.
d.
Test condition I.
e.
Measurements after shock: Resistance shall be measured as specified in 4.8.5.
f.
Inspection after shock: Networks shall be inspected for evidence of mechanical damage.
4.8.18 Vibration, high frequency (see 3.23). Networks shall be tested in accordance with method 204 of
MIL-STD-202. The following details and exception shall apply:
a.
Mounting: As specified in 4.8.17a.
b.
Test leads: As specified in 4.8.17b.
c.
Measurements before vibration: As specified in 4.8.17c.
d.
Test condition D.
e.
Measurements after vibration: As specified in 4.8.17e.
f.
Inspection after vibration: Networks shall be inspected for evidence of mechanical damage.
31
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business