4.4.2 Test routine. Sample units shall be subjected to the qualification inspection specified in table XII, in the order
shown. All sample units shall be subjected to the inspection of group I, except for the sample units required for
group X. All sample units shall be divided as specified in table XII for group II through group IX inclusive, and
subjected to the inspection for their particular group. Sample sizes and extent of qualification shall be as specified in
appendix A of this specification.
4.4.3 Defectives. Defectives in excess of those allowed in table XII shall be cause for refusal to grant qualification.
4.4.4 FRL and quality level verification (ER styles only).
4.4.4.1 FR qualification. FR qualification shall be in accordance with the general requirements and detail
requirements of MIL-STD-690 and the following details:
a.
Procedure I: Qualification at the initial FR level. Level M (1.0 percent of FRSP-60) shall apply. Sample
units shall be subjected to the qualification inspection specified in group VII of table XII (see 4.4.2). Entire
life test sample shall continue on test to 10,000 hours as specified in 4.8.19, upon completion of the 2,000
hour qualification.
Procedure II: Extension of qualification to lower FR levels. To extend qualification to the R (0.01 percent)
b.
and S (0.001 percent) FRL, unit hours from two or more styles of similar construction may be combined.
Style combinations shall be as described for lot formation (see 4.6.2.1).
c.
Procedure III: Maintenance of FR level qualification. Maintenance period B of FRSP-10 shall apply.
Regardless of the number of production lots produced during this period, the specified number of unit hours
shall be accumulated to maintain qualification (see 4.7, periodic group C inspection).
4.5 Verification of qualification. Every 6 months, the manufacturer shall provide verification of qualification to the
qualifying activity. Continued qualification is based on meeting the following requirements.
a.
MIL-STD-790 program.
b.
Design of networks has not been modified.
c.
Lot rejection for group A (subgroup 1 and subgroup 3) does not exceed 5 percent or one lot, whichever is
greater.
d.
Lot rejection for group B does not exceed 5 percent or one lot, whichever is greater.
e.
Periodic group C inspection.
f.
FRL.
g.
PPM assessment (NOTE: Grouping of styles is permitted).
h.
Continued qualification to non-ER level (C) shall be based on continued maintenance of qualification for the
ER part (minimum M FRL maintained).
4.6 Conformance inspection.
4.6.1 Inspection of product for delivery.
4.6.1.1 Non-ER networks. Group A inspection for non-ER resistors shall be used for preparation for delivery
(see 4.6.3.1, non-ER group A inspection).
4.6.1.2 ER networks. Inspection of product for delivery shall consist of the group A and group B inspection.