MIL-PRF-39017G
d. Lot rejection for group B inspection does not exceed 5 percent or one lot, whichever is greater.
e. Periodic group C inspection.
f.
FR levels.
g. PPM assessment (NOTE: Grouping of style is permitted).
h. Continued qualification to non-ER ("C") shall be based on continued maintenance of qualification
for the ER part (minimum "P" FR level maintained).
4.6 Conformance inspection.
4.6.1 Inspection of product for delivery.
4.6.1.1 Non-ER resistors. Inspection of product for delivery shall consist of the requirements in 4.6.3.1.
4.6.1.2 ER resistors. Inspection of product for delivery shall consist of group A and group B
inspections. Group B inspection for preparation of delivery is not required when the qualifying activity has
allowed group B testing to be performed annually (see table XIII).
4.6.2 Inspection and production lot.
4.6.2.1 Inspection lot. An inspection lot, as far as practicable, shall consist of all resistors of the same
style, characteristic, and protective enclosure or coating and manufactured under essentially the same
process and conditions during a manufacturing period of 1 month maximum. For purposes of lot
formation all terminal types may be included in the same lot; however, all lead types which are combined
shall have the same method of terminal attachment. All leads in the lot shall be represented in a similar
proportion by samples selected for inspection. Non-ER and ER lots shall be kept separate.
4.6.2.2 Production lot. A production lot shall consist of all resistors of the same style, nominal
resistance value, resistance tolerance, resistance temperature characteristic, and termination type.
Manufacture of all parts in the lot shall have been started, processed, assembled, and tested as a group.
Lot identity shall be maintained throughout the manufacturing cycle. Non-ER and ER lots shall be kept
separate.
4.6.3 Group A inspection.
4.6.3.1 Non-ER resistors. The manufacturer shall establish and maintain an inspection system to
verify resistors meet dc resistance, visual/mechanical, and solderability requirements. In-line or process
control may be part of such a system. The inspection system shall also include criteria for lot rejection
and corrective actions. The inspection system shall be verified under the overall MIL-STD-790 QPL
system. NOTE: Since the non-ER (C level) is the ER design without the mandatory conformance
inspection and FR level assessment, this product is still expected to meet the environmental qualification
type requirements (e.g., moisture resistance, shock, vibration, etc.).