MIL-PRF-39015E
4.4.2 Test routine. Sample units shall be subjected to the qualification inspection specified in table V,
in the order shown. Sample test routine shall be as indicated in the appendix A. The qualification of
other than "P" type terminals shall be only applicable at the time of the original submission (see table A-I).
The manufacturer shall not submit all of one terminal type at original submission and request
qualification extension to a different terminal by partial submission at a later date. The qualification life
sample shall be continued on test for 10,000 hours. The requirement of 3.31.2 shall apply for FR data
accumulation.
4.4.3 Defectives. Defectives in excess of those allowed in table V shall be cause for refusal to grant
qualification approval.
4.4.4 FR qualification. FR qualification shall be in accordance with the general and detail requirements
of MIL-STD-690 and the following details:
a. Procedure I: Qualification at the initial FR level. Level M (1.0 percent of FRSP-60) shall apply.
Sample units shall be subjected to the qualification inspection specified in group VII, table V (see
completion of the 2,000 hour qualification.
b. Procedure II: Extension of qualification to lower FR levels. To extend qualification to the "R"
level (0.01 percent) and "S" (0.001 percent) FR level unit hours, two or more styles of similar
construction may be combined. Style combination shall be as described for lot formation (4.6.2).
c.
Procedure III: Maintenance of FR level qualification. Maintenance period "B" of FRSP-10 shall
apply. Regardless of the number of production lots produced during this period, the specified
number of unit hours shall be accumulated to maintain qualification (see 4.7).
4.4.5 PPM level verification. The contractor is responsible for establishing a quality system to assess
the PPM level of lots that are subjected to group A inspections. The PPM defect level shall be based on
a 6 month moving average.
4.5 Verification of qualification . Every 6 months, the manufacturer shall provide verification of
qualification to the qualifying activity. Continued qualification is based on meeting the following
requirements.
a. MIL-STD-790 program.
b. Design of resistor has not been modified.
c.
Lot rejection for group A (subgroup 1 and subgroup 3) does not exceed 10 percent or one lot,
whichever is greater.
d. Periodic group B inspection.
e. FR levels.
f.
PPM assessment (NOTE: Grouping of style is permitted).
g. Continued qualification to non-ER ("C") shall be based on continued maintenance of qualification
for the ER part (minimum "M" FR level maintained).
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business