MIL-PRF-39015E
TABLE V. Qualification inspection - Continued.
1/ See appendix A for details.
2/ Failure of a single resistor in one or more tests of a group shall be charged as a single defective.
3/ Group I tests need not be performed if manufacturer presents certified data proving tests have
been previously performed on the qualification sample units.
4/ Nondestructive tests.
5/ Marking shall be considered defective only if illegible or missing. Marking shall remain legible at
the end of all tests.
6/ Test shall not be performed if manufacturer certifies that all external materials are fungus
resistant.
4.6 Conformance inspection.
4.6.1 Inspection of product for delivery.
4.6.1.1 Non-ER resistors. Inspection of product for delivery shall consist of the requirements in 4.6.3.1.
4.6.1.2 ER resistors. Inspection of product for delivery shall consist of group A inspection (see
4.6.3.2).
4.6.2 Inspection and production lot.
4.6.2.1 Inspection lot. An inspection lot, as far as practicable, shall consist of all resistors of the same
style, characteristic, and protective enclosure or coating and manufactured under essentially the same
process and conditions during a manufacturing period of 1 month maximum. For purposes of lot formation
all terminal types may be included in the same lot; however, all lead types which are combined shall have
the same method of terminal attachment. All leads in the lot shall be represented in a similar proportion by
samples selected for inspection. Non-ER and ER lots shall be kept separate.
4.6.2.2 Production lot. A production lot shall consist of all resistors of the same characteristic, style,
nominal resistance value, and resistance tolerance. Manufacture of all parts in the lot shall have been
started, processed, assembled, and tested as a group. Lot identity shall be maintained throughout the
manufacturing cycle. Non-ER and ER lots shall be kept separate.
4.6.3 Group A inspection.
4.6.3.1 Non-ER resistors. The manufacturer shall establish and maintain an inspection system to
verify resistors meet visual/mechanical, peak noise, total resistance, immersion, and solderability
requirements. In-line or process control may be part of such a system. The inspection system shall also
include criteria for lot rejection and corrective actions. The inspection system shall be verified under the
overall MIL-STD-790 QPL system. NOTE: Since the non-ER (C level) is the ER design without the mandatory
conformance inspection and FR level assessment, this product is still expected to meet the environmental
qualification type requirements (e.g., moisture resistance, shock, vibration, etc.).
4.6.3.2 ER resistors. Group A inspection shall consist of the inspections specified in table VI, in the
order shown.
15
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business