MIL-PRF-39009E
3.25 Soldering. Where soldering is employed, only noncorrosive fluxes shall be used, unless it can be
shown that corrosive elements have been satisfactorily removed after soldering. Solder shall not be used
for obtaining mechanical strength. Electrical connections shall be mechanically secure before soldering
and electrically continuous after soldering. Except for solder used to coat the terminals, the solder used
shall in no case start to melt at a temperature less than +300°C.
3.26 Recycling, recovered, or environmentally preferable materials. Recycled, recovered, or
environmentally preferable materials should be used to the maximum extent possible provided that the
material meets or exceeds the operational and maintenance requirements, and promotes economically
advantageous life cycle costs.
3.27 Workmanship. Resistors shall be processed in such a manner as to be uniform in quality and shall
be free from other defects that will affect life, serviceability, or appearance.
4. VERIFICATION
4.1 Classification of inspection. The inspection requirements specified herein are classified as follows:
a. Qualification inspection (see 4.4).
b. Verification of qualification (see 4.5).
c. Conformance inspection (see 4.6).
d. Periodic group C inspection (see 4.7).
4.2 Reliability and quality.
4.2.1 QPL system. The manufacturer shall established and maintain a QPL system (see 3.3).
Evidence of such compliance is a prerequisite for qualification and verification of qualification.
4.2.2 SPC. A SPC program shall be maintained in accordance with EIA-557. Evidence of such
compliance is a prerequisite for qualification and verification of qualification.
4.3 Inspection conditions and precautions.
4.3.1 Inspection conditions. Unless otherwise specified herein, all inspections shall be performed in
4.3.2 Precautions. Adequate precautions shall be taken during inspection to prevent condensation of
moisture on resistors, except during moisture-resistance test. Precautions shall be also taken to prevent
damage by heat when soldering resistor leads to terminals.
4.4 Qualification inspection. Qualification inspection shall be performed at a laboratory acceptable to
the Government (see 6.3).
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business