MIL-PRF-39009E
4.5 Verification of qualification . Every 6 months, the manufacturer shall provide verification of
qualification to the qualifying activity. Continued qualification is based on meeting the following
requirements.
a. MIL-STD-790 program.
b. Design of resistor has not been modified.
c. Lot rejection for group A (subgroup 1 and subgroup 4) does not exceed 5 percent or one lot,
whichever is greater.
d. Lot rejection for group B inspection does not exceed 5 percent or one lot, whichever is greater.
e. Periodic group C inspection.
f. FR levels.
g. PPM assessment (NOTE: Grouping of style is permitted).
h. Continued qualification to non-ER level (C) shall be based on continued maintenance of
qualification for the ER part (minimum P FR level maintained).
4.6 Conformance inspection.
4.6.1 Inspection of product for delivery.
4.6.1.1 Non-ER resistors. The manufacturer's inspection system shall be used for preparation for
delivery.
4.6.1.2 ER resistors. Inspection of product for delivery shall consist of group A and group B
inspections. Group B inspection for delivery is not required when the qualifying activity has allowed group
B testing to be preformed annually (see table IX).
4.6.2 Inspection and production lot.
4.6.2.1 Inspection lot. An inspection lot, as far as practical, shall consist of all the resistors of the same
style, characteristic, protective enclosure or coating, and manufacturer under essentially the same process
and conditions during a manufacturing period of 1 month maximum. For purposes of lot formation all
terminal types may be included in the same lot; however, all lead types which are combined shall have the
same method of terminal attachment. All leads in the lot shall be represented in a similar proportion by
samples selected for inspection. Non-ER and ER lots shall be kept separate.
4.6.2.2 Production lot. A production lot shall consist of resistors of the same style, nominal resistance
value, resistance tolerance, resistance temperature characteristic, and terminal type. Manufacture of all
parts in the lot shall have been started, processed, assembled, and tested as a group. Lot identity shall be
maintained throughout the manufacturing cycle. Non-ER and ER lots shall be kept separate.
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business