MIL-PRF-39009E
4.7 Periodic Group C inspection (ER only). Periodic inspection shall consist of group C inspection tests
specified in table X, in the order shown. They shall be performed on sample units selected from lots that
have passed group A and group B inspection. Except where the results of these inspections show
noncompliance with the applicable requirements (see 4.7.6), delivery of products which have passed
group A and group B inspections shall not be delayed pending the results of these periodic inspections.
4.7.1 Sampling plan. If more than 1,000 resistors of any style or style grouping are produced over the
maintenance period, the group C tests shall be performed as specified. If the production rate is less than
1,000 resistors for any style or style grouping over the maintenance period then the monthly, quarterly or
semi-annual group C inspection may be postponed until at least 1,000 resistors of that style or style
grouping are produced (except for the monthly life test). In any case, the monthly tests shall be performed
at least once every 3 months. The quarterly tests shall be performed at least every 6 months and the
semi-annual tests shall be performed at least once every year. This requirement is waived if the
manufacturer has obtained a reduced inspection status through the qualifying activity.
All qualified styles may be grouped together in a single sample. This can be accomplished by proportion
based on manufacturing percentages by style, equally divided by style, or by establishing an alternating
style sequence. In order to incorporate a style sampling grouping, a written description must be presented
and approved by the qualifying activity. This plan must assure that the grouping only combines styles of
the same basic design, encapsulation material, and the same element type.
4.7.2 Monthly.
4.7.2.1 Monthly (subgroup 1). A minimum of five samples shall be selected from each inspection lot
and placed on extended life test of 4.8.13 once a month for the full 10,000-hour life test. A sufficient
number of samples shall be selected from each lot by the manufacturer so that the maintenance of the FR
requirements is complied within specified maintenance period. As far as practicable, the manufacturer
shall select the resistance values so that the full range of all resistance decades produced during the
maintenance period is represented. The accumulated data shall be used for maintenance or extension of
FR qualification (see 3.19.2).
4.7.2.2 Monthly (subgroup 2 and subgroup 3). Each month the specified number of sample units shall
be subjected to the inspections of table X.
4.7.3 Quarterly. Sample units and tests shall be as specified in table X.
4.7.4 Annual. Sample units and test shall be as specified in table X.
4.7.5 Disposition of samples. Sample units which have been subjected to group C inspection shall not
be delivered on the contract or order.
17
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business