MIL-PRF-39009E
APPENDIX A
PROCEDURE FOR QUALIFICATION INSPECTION
A.1 SCOPE
A.1.1 Scope. This appendix details the procedure for submission of samples, for qualification
inspection, of resistors covered by this specification. The procedure for extending qualification of the
required sample to other resistors covered by this specification is also outlined herein. This appendix is a
mandatory part of the specification. The information contained herein is intended for compliance.
A.2 APPLICABLE DOCUMENTS
A.2.1 General. The documents listed in this appendix are specified in sections A.3, A.4, and A.5 of this
specification. This section does not include documents cited in other sections of this specification or
recommended for additional information or as examples. While every effort has been made to ensure the
completeness of this list, document users are cautioned that they must meet all specified requirements
documents cited in sections A.3, A.4, and A.5 of this specification, whether or not they are listed.
A.2.2 Government documents.
A.2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and
handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the
issues of these documents are those cited in the solicitation or contract.
DEPARTMENT OF DEFENSE STANDARDS
-
Leads for Electronic Components Parts.
(Copies of these documents are available online at https://assist.daps.dla.mil/quicksearch/ or
https://assist.daps.dla.mil or from the Standardization Document Order Desk, 700 Robbins Avenue,
Building 4D, Philadelphia PA 19111-5094.)
A.2.3 Order of precedence. In the event of a conflict between the text of this document, and the
references cited herein (except for related specification sheets) the text of this document takes
precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a
specific exemption has been obtained.
A.3 SUBMISSION
A.3.1 Product levels. Qualification of the C (nonestablished reliability) level, is predicated upon meeting
the established reliability qualification requirements for FR level P (see A.4.1). The procedure for
submitting samples to become qualified to the initial failure level M is specified in A.3.2.
A.3.2 Sample. A sample consisting of 252 units in each style shall be subjected to the qualification
inspection specified in table V, in the order shown. All sample units shall be subjected to the inspection of
group I and group IA. The sample units shall then be divided as specified in table V for group II to group
V. In addition, ten sample units shall be subjected to group VI.
28
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business