4.8.19 Life (see 3.24). Networks shall be tested in accordance with method 108 of MIL-STD-202. The following
details and exceptions shall apply:
Mounting: As specified in 4.8.1, method B. If forced air circulation is employed, the air velocity shall not
a.
exceed 500 feet per minute and there shall be no direct impingement of the forced-air supply upon the
networks.
b.
Test temperature and tolerance:
(1) Qualification inspection: 70OC ±5OC.
FR determination: 70OC ±5OC.
(2)
c.
Initial measurements: Measurements shall be made inside or outside the chamber.
(1) Inside of chamber: When measurements are to be made inside the chamber, the initial dc resistance
shall be measured at the applicable test temperature, after temperature stabilization, and within 8 hours
of exposure of the resistor networks to the test temperature. This initial measurement shall be used as
the reference temperature for all subsequent measurements under the same condition.
(2) Outside of chamber: When measurements are to be made outside the chamber, the initial dc
resistance shall be measured at room temperature. This initial measurement shall be used as the
reference temperature for all subsequent measurements under the same condition.
d.
Operating conditions: Rated dc continuous working voltage, filtered or nonfiltered full-wave rectified ac
voltage, shall be simultaneously applied to each resistor in the network intermittently, one and one-half
hours "on" and one-half hour "off", for the specified number of hours and at the test temperature. During the
"on" cycle, the voltage shall be regulated and controlled to maintain the rated continuous working voltage
within ±5 percent. In no case shall the network power rating be exceeded.
e.
Test condition: 2,000 hours elapsed time for qualification inspection with all samples continued to 10,000
hours; 10,000 hours for FRL inspection of group C.
f.
Measurements during test:
(1) Qualification inspection: DC resistance shall be measured at the end of the one-half hour "off" periods
after 250 hours +72 hours, -24 hours; 500 hours +72 hours, -24 hours; 1,000 hours +72 hours, -24
hours; 2,000 hours, +96 hours, -0 hours have elapsed.
(2) Extended life testing: DC resistance shall be measured at the end of one-half hour "off" period after 250
hours +72 hours, -24 hours; 500 hours +72 hours, -24 hours; 1,000 hours +72 hours, -24 hours; 2,000
hours +96 hours, -24 hours; and every 2,000 hours +96 hours, -24 hours thereafter until required
10,000 hours +120 hours, -0 hours have elapsed. Measurements shall be made as near as possible to
the specified time but may be adjusted so that measurements need be made only during the normal
workday.
(3) Measurements outside of chamber: When measurements are made outside the chamber, networks
shall be outside of the chamber for a minimum of 45 minutes and stabilized before measurement.
g.
Inspection after test: Networks shall be inspected for evidence of mechanical damage.