MIL-R-93F
TABLE VII. Qualification inspection.
Inspection |
Requirement paragraph |
Method paragraph |
Number of sample units for inspection |
Number of defectives allowed 1/ |
Certification requirements Fungus |
3.22 |
4.7.18 |
N/A |
|
Group I DC resistance Visual and mechanical examination 2/ Short time overload Thermal shock |
3.6 3.1, 3.3 to 3.4.3 inclusive, 3.23 to 3.26 inclusive 3.7 3.8 |
4.7.2 4.7.1 4.7.3 4.7.4 |
100 percent |
0 |
Group IA Solderability 3/ Resistance to solvents |
3.9 3.10 |
4.7.5 4.7.6 |
10 |
1 |
Group II Insulation resistance Moisture resistance Dielectric withstanding voltage Terminal strength |
3.11 3.12 3.13 3.14 |
4.7.7 4.7.8 4.7.9 4.7.10 |
6 |
|
Group III Life |
3.15 |
4.7.11 |
6 |
|
Group IV Resistance temperature characteristic Low temperature storage Low temperature operation High temperature exposure |
3.16 3.17 3.18 3.19 |
4.7.12 4.7.13 4.7.14 4.7.15 |
6 |
|
Group V Shock, specific pulse Vibration, high frequency |
3.20 3.21 |
4.7.16 4.7.17 |
6 |
|
Group VI Visual and mechanical examination |
3.1, 3.3 to 3.4.3 inclusive, 3.23 to 3.26 inclusive |
4.7.1 |
2 |
1/ Failure of a resistor in one or more tests of a group shall be charged as a single defective.
2/ Marking shall be considered defective only if the marking is illegible.
3/ Not applicable to terminal type W.
4.6 Conformance inspection.
4.6.1 Inspection of product for delivery. Inspection of product for delivery shall consist of group A and group B inspection.
4.6.1.1 Inspection lot. An inspection lot, as far as practicable, shall consist of all resistors of the same style produced in a period not to exceed 30 days, produced under essentially the same conditions, and offered for inspection at one time.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business