MIL-R-26/6D
6.2 Acquisition requirements. Acquisition requirements are as specified in MIL-PRF-26.
a. Title, number, and date of this specification, and the complete PIN (see 1.2).
b. If not otherwise specified (see 2.1), the versions of the individual documents referenced will be those in effect on the date of release of the solicitation.
c. Packaging instructions (see 5.1).
6.3 Derating. Resistors shall be derated, when necessary, in accordance with figure 2.
FIGURE 2. Derating curve for high ambient temperatures.
6.4 Substitution data. The resistors specified herein are not for use in new design. They are authorized for use in design contracts effective prior to or on 11 May 1973 and to support existing military equipment. Resistors of MIL-PRF-39007 are preferred for new design and can be used as substitutes for the inactivated resistors as follows:
MIL-PRF-26 (style) |
Specification sheet |
Substitute style |
Resistance tolerance |
RW80 |
RWR80 |
B, D, and F |
|
RW81 |
RWR81 |
B, D, and F |
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business