MIL-PRF-39005/8C
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is not
mandatory.)
6.1 Notes. The notes specified in MIL-PRF-39005 are applicable to this specification.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of the specification.
*
b. If not otherwise specified (see 2.1), the versions of the individual documents referenced will be
those in effect on the date of release of the solicitation.
c. Packaging requirements (see 5.1).
6.3 Supplementary insulation. Where potential to ground is over 100 volts, supplementary insulation
should be provided.
*
6.4 Changes from previous issue. The margins of this specification are marked with asterisks to
indicate where changes from the previous issue were made. This was done as a convenience only and
the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and
contractors are cautioned to evaluate the requirements of this document based on the entire content
irrespective of the marginal notations and relationship to the last previous issue.
Custodians:
Preparing activity:
Air Force - 11
DLA - CC
DLA - CC
NASA - NA
(Project 5905-2008-026)
Review activities:
Air Force - 19
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency of
the information above using the ASSIST Online database at https://assist.daps.dla.mil.
4
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business