3.15 High temperature exposure. The maximum allowable change in zero power resistance as the
result of the high temperature exposure test shall be ±1 percent after 100 hours, and ±2 percent after
1,000 hours.
3.16 Vibration, high frequency. The maximum allowable change in zero power resistance as the result
of vibration test shall be ±2 percent.
3.17 Shock, specified pulse. The maximum allowable change in zero power resistance as the result of
the shock test shall be ±2 percent.
3.18 Immersion. The maximum allowable change in zero power resistance as the result of the
immersion test shall be ±3 percent.
4. VERIFICATION
4.1 Sampling and inspection. Sampling and inspection shall be in accordance with MIL-PRF-23648.
4.2 Terminal strength.
4.2.1 Direct load. Direct load shall be applied gradually until the load reaches 4.5 pounds.
4.3 Solderability. The solderability test is applicable to this specification except the steam aging
requirement shall be 60 minutes +5 minutes, -0 minutes.
4.4 Resistance to soldering heat. The resistance to soldering heat is applicable to this specification.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the
contract or purchase order. When actual packaging of materiel is to be performed by DoD personnel
these need to contact the responsible packaging activity to ascertain requisite packaging requirements.
Packaging requirements are maintained by the Inventory Control Point's packaging within the Military
Department or Defense Agency, or within the Military Department's System Command. Packaging data
retrieval is available from the managing Military Department's or Defense Agency's automated packaging
files, CD-ROM products, or by contacting the responsible packaging activity.
6. NOTES
(This section information of a general or explanatory nature that may be helpful, but is not mandatory.)
6.1 Intended use. The notes specified in MIL-PRF-23648 are applicable to this specification.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of the specification.
b. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of individual
documents referenced (see 2.2.1).
c. Packaging requirements (see 5.1).
5